info@aathaworld.com 

+(60)11-7001 1003 (Monday to Friday) 

+(60)11-1188 1003 (Saturday, Sunday & Public Holiday)

© 2020 by Aathaworld Sdn Bhd. All Rights Reserved.

  • LinkedIn Social Icon
  • Facebook Social Icon

Power Plant Contractor Malaysia | New and Maintenance

October 22, 2018

Aathaworld Sdn Bhd is able to service power plant project, from power plant renovation in term of engineering, procurement, construction (civil and structural, C&S), fabrication, commissioning and machinery maintenance (mechanical & electrical, M&E) work. There are so many types of electric power generation source but Malaysia’s fossil fuels are heavily relying on coal, fuel-oil and natural gas. However, due to the fact in which Malaysia is geographically located at a strategic location on the earth, it is also gifted with enormous amount of renewable energy resources, including hydro power plant, solar electric generated from solar (photovoltaic) cells, ocean and biomass. According to power plant specialist in Malaysia, there are also other thermal energy including petroleum, nuclear energy, geothermal energy as well as chemical energy such as fuel cells and batteries. Depending on the usage and location feasibility, Malaysia has also municipal waste and biogas as renewable energy source of electricity, especially the agricultural waste from palm oil industry.

Since Malaysia is the second largest oil palm producer in the World, therefore palm oil plantation and its processing plants are widespread throughout the whole Malaysia. We basically cover KL Kuala Lumpur, Selangor, Klang Valley, Kluang, Johor and other states of Malaysia. As a power plant contractor in Malaysia, that is why we promise to deliver best quality of power plant including palm oil processing factory renovation work and palm oil machinery service in Malaysia. Palm oil mill usually has their own mini power plant that can self-sustain from biomass and biogas, since those wastes produced during the palm oil process are excessive where they can sell to third party too; for example, empty fruit bunch (EFB) after fruits extracted from fresh fruit bunch. The reason why palm oil factory will have their own set up of electricity-generating plant because they are operating at 24 hours and 7 days a week, either fruits planted on its own or purchase it from third party’s estate.

Power plant specialist Malaysia mentions also